Showing posts with label Oconomowoc Wisconsin. Show all posts
Showing posts with label Oconomowoc Wisconsin. Show all posts

Friday, October 3, 2025

Grand Opening: Phase I of Stor-It Right!

 

Thrive Architects is proud to partner with Stor-It Right and Wellspring Construction to bring a new generation of storage design to Oconomowoc.


Phase I is now complete — and this isn’t your ordinary storage facility. 


Together, we designed a site that raises the bar with:

• Durable steel building systems built to last
• Climate-controlled units with precise temperature & humidity control
• In-unit power & LED lighting in select units
• Motion-sensor lighting and secure 24/7 access
• Bold exterior finishes — crisp polar white with charcoal gray trim
• A private office featuring a full glass storefront


Every detail was thoughtfully designed to maximize functionality and security — from energy-efficiency to accessibility.



And we’re not done yet! Phase II is already on the horizon with four additional buildings.


Thrive Architects is proud to help Stor-It Right set a new standard for self-storage in Wisconsin.


#ThriveArchitects #MilwaukeeArchitects #WisconsinArchitects #CommercialArchitecture #StorItRightStorage #MilwaukeeWisconsin #OconomowocWisconsin

Thursday, August 7, 2025

Phase I for Stor-It Right is Underway!


Construction is progressing on phase one of the new Stor-It Right self-storage facility in Oconomowoc, just south of Hwy 67 and I-94. Phase one includes four pre-engineered metal buildings totaling just over 44,000 square feet, with plans to expand to eight buildings in future phases.

 

Designed with functionality and convenience in mind, the facility will offer 24-hour secure access to climate-controlled storage units ranging from 25 to 200 square feet. Drive-up units will also be available, ranging from 200 square feet to the impressive 1,250 square foot SUPER MEGA units – each equipped with full climate and humidity control, in-unit power, a 14’x14’ automatic garage door, and floor drains, making them ideal for small business owners and car collectors.

 


Stor-It Right strikes the perfect balance between operational efficiency, long-term durability, and a clean, modern design.

 

Exciting progress – with more to come Stay tuned!

 

CLIENT: Stor-It Right

CONTRACTOR: Wellspring Construction Group

CIVIL ENGINEER: RA Smith

ARCHITECT: Thrive Architects

 

#ThriveArchitects #MilwaukeeArchitects #WisconsinArchitects #CommercialArchitecture #StorItRightStorage #MilwaukeeWisconsin #OconomowocWisconsin

Friday, May 30, 2025

White Stone Community Church is Celebrating a New Sanctuary!


We’re thrilled to share that White Stone Community Church has been worshipping in their new sanctuary since Mother’s Day — a milestone that marks the culmination of a truly transformative project.

This endeavor involved both a substantial remodel and a thoughtfully designed addition, totaling nearly 41,000 square feet. As architects, it was a privilege to partner with White Stone in reimagining their campus and crafting spaces that not only serve functional needs but also foster deeper community connection.

From the beginning, our design process was rooted in a shared vision: to create welcoming, purpose-driven environments that reflect the heart of the church. The result is a series of vibrant, engaging spaces, including:
• A new Sanctuary space, which doubled their seating capacity for meaningful worship experiences
• A large, light filled gathering space, designed for flexible use throughout the week
• A glass-enclosed entryway that offers a sense of openness and connection to the outdoors
• A warm and inviting cafĂ© area, complete with high-top seating and communal tables to encourage gathering and conversation
• A playful, secure Kids Corner for families and young children
• A custom brick fireplace, featuring a hand-cut stone rendering of the church’s logo — a distinctive focal point that honors the church’s identity and heritage


Every detail — from material selections to spatial flow — was carefully considered to align with White Stone’s mission and enhance the overall experience for their members and guests.

We’re honored to have been a part of this journey and look forward to seeing how these new spaces support the church’s continued growth and impact.

Photo Credit: Moments by Kelly

#ThriveArchitects #MilwaukeeArchitects #WisconsinArchitects #CommercialArchitecture #WhiteStoneCommunityChurch #ReligiousArchitecture #Community #OconomowocWI

Tuesday, January 28, 2025

Evin at Oconomowoc Starts Additions!



Change is underway at Evin at Oconomowoc! Our Thrive team has been meticulously working on a three-story addition that will provide over 72,000 square feet of living space for residents. This new senior living addition will feature a creative lab, activity spaces, and a covered rooftop patio. A glass walkway will seamlessly connect the new addition to the existing Evin building. Stay tuned for more updates!



PROJECT STATS:

72,847 sq ft | 54 units


Architect: Thrive Architects

Civil Engineering: Pinnacle Engineering Group

Structural Engineering: Pierce Engineering

Contractor: Catalyst Construction


#ThriveArchitects #MilwaukeeArchitects #WisconsinArchitects #EvinOconomowoc #CommunityArchitecture #CommercialArchitecture #designinspo